• Film Box Automatic Glue Line Automatic Assembly Machine
  • Film Box Automatic Glue Line Automatic Assembly Machine
  • Film Box Automatic Glue Line Automatic Assembly Machine
  • Film Box Automatic Glue Line Automatic Assembly Machine
  • Film Box Automatic Glue Line Automatic Assembly Machine
  • Film Box Automatic Glue Line Automatic Assembly Machine

Film Box Automatic Glue Line Automatic Assembly Machine

Transmission Type: Flexible
Rhythm: Flow Production Line
Automatic Production Line: Assembly
Production Scope: Parts Production Line
Flexible Production: Intelligent Manufacturing
Certification: ISO
Customization:
Gold Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
Film box automatic glue line
Condition
New
Automation
Automatic
After-sales Service
1 Years
Product Name
Hose Clamp Machine
Transport Package
Wooden Box
Specification
2*3*2m
Trademark
SNW
Origin
Xiamen, Fujian Province, China
Production Capacity
1000 Sets/Year

Product Description

Film box automatic glue line

Line body process:

Manual unpacking -- robot chassis -- gluing -- drying -- attaching magnetic sheet -- placing gasket -- sealing film -- cutting edge -- receiving material

Process description:

Manual unpacking: manually open the box filled with chassis, and fix the edge of the carton leaf and plastic bag, put it into the double-layer conveyor line, and the double-layer conveyor, double-layer flat shifter and small elevator cooperate to transport the carton to the robot film box station;


Robot chassis: The robot takes out the film boxes stacked face to face in the carton one by one and puts them into the track, the track facing up is directly put into the track, the track facing up is turned over and put into the track, the film box is transported to the gluing machine by the connection platform, the empty carton is transported to the upper track cache of the double-layer conveyor line, and the upper conveyor track returns it to the manual unpacking station;

Gluing: After the gluing machine locates the film box, it automatically finishes gluing the product according to the edited path. After gluing, the product is transported to the vertical drying furnace by the connecting platform;

Drying: The vertical drying oven cashes the coated film box layer by layer, and dries the glue on the film box through the internal hot air circulation. After drying, the flat shifting machine transfers it to the plate suction machine.

Magnetic disc attachment: After the film box is positioned by the suction machine, the magnetic disc is removed from the material box by the transfer mechanism and the suction nozzle on the device, OK is mounted on the magnetic disc, and NG is directly cast and transferred to the next suction machine after mounting;

Placing gasket: After the film box is positioned by the plate suction machine, the gasket is drawn from the periphery of the track into the chassis on the track by using the transmission mechanism and suction nozzle on the device. After the gasket is placed, the chassis is transported to the sealing film station;

Sealing film: After the chassis is positioned by the sealing machine, the film is taken and sealed by the manipulator or XY transfer mechanism, and the film is rolled by the roller. After sealing, the new and old wire chassis is imported into the cutting machine by the double-layer elevator and the double-layer conveying line in the air.

Cutting edge: After the cutting machine locates the chassis, the protruding film edge is cut by the manipulator, and it is transferred to the turning machine after completion, and the chassis is turned over in the order of one positive and one reverse;

Receiving material: the plate machine will push a positive and reverse chassis into the customized material box one by one, and wait for manual removal after the material box is filled;



 

After-sales service

1.Machine inspection before delivery When you come to our factory, check whether everything is normal.

2.Provide some necessary spare parts for free.

3.One year guarantee for all machines. If there is any problem, we will assume it. Of course, if the machine is one year later, you can also ask for technical guidance.

4.After the final acceptance of the equipment, we will provide free training for your operators on equipment operation.

5.The warranty period starts from the date when the equipment arrives at the production site of the Demander and the acceptance is completed. For equipment damage not caused by human error, all maintenance and parts replacement are provided free of charge, and the personnel costs are also borne by the Supplier.

Why choose us?
1. All machines are manufactured by us to reduce the cost of customers.

2. We have more than 20 years of mechanical manufacturing experience, low price and high quality.
We usually guarantee the quality of machine parts. And provide parts for the service life of the machine at a reasonable price.

3.If you need to replace any parts, we will send them by express as soon as possible.

4. Installation service When you have completed the preparation conditions, our fast and professional after-sales service engineer team will go to.

5. We should pay attention to every detail in the manufacturing process. The quality control of our factory is very strict. All machines must be checked many times before they are delivered to our customers.



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now